QA/QC/Commissioning Manager - Data Center Construction

Cumming Group

$93K — $124K *
Information Technology
5 - 7 years of experience
Job Overview by Ladders

Qualifications

  • Bachelor's degree in Engineering, Construction Management, Architecture, or related field; equivalent experience considered.
  • 5+ years of experience in commissioning, QA/QC, construction management, MEP systems, or mission critical/data center projects.
  • Experience with HVAC, electrical, plumbing, controls, fire/life safety, and critical facility systems.
  • Knowledge of commissioning and quality standards, including ASHRAE, LEED, BCA, and applicable building codes.
  • Strong documentation, technical writing, communication, and stakeholder management skills.
  • Proficiency with Microsoft Office; commissioning and document control software experience preferred.

Responsibilities

  • Lead commissioning and QA/QC activities throughout the project lifecycle.
  • Develop and manage commissioning plans, quality plans, and testing procedures.
  • Review OPRs, BODs, drawings, specifications, and submittals for compliance.
  • Coordinate between owners, contractors, design teams, vendors, inspectors, and testing providers.
  • Verify equipment startup and functional performance testing.
  • Conduct site inspections and monitor installation for quality and compliance.
  • Manage quality documentation, RFIs, NCRs, inspection reports, and turnover packages.

Benefits

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program
Full Job Description
We are seeking a highly skilled and motivated QA/QC/Commissioning Manager - Data Center Construction to be part of our team in Kansas City, MO

The QA/QC/Commissioning Manager - Data Center Construction oversees commissioning, quality assurance, and quality control activities for data center and mission critical construction projects. This role ensures systems, equipment, and installations meet owner requirements, project specifications, safety standards, and operational performance objectives from design through turnover.

Responsibilities
  • Lead commissioning and QA/QC activities throughout the project lifecycle.
  • Develop and manage commissioning plans, quality plans, testing procedures, issue logs, and project closeout documentation.
  • Review OPRs, BODs, drawings, specifications, and submittals for compliance and constructability.
  • Coordinate owners, contractors, design teams, vendors, inspectors, and testing providers.
  • Verify equipment startup, pre-functional checklists, TAB reports, and functional performance testing.
  • Conduct site inspections and monitor installation quality and compliance with project requirements.
  • Manage quality documentation, RFIs, NCRs, inspection reports, testing records, and turnover packages.
  • Lead quality and commissioning meetings, track deficiencies, and drive issue resolution.
  • Support audits, warranty management, LEED commissioning, and energy efficiency initiatives.
  • Provide project status updates, risk assessments, and technical support to stakeholders.

Qualifications
  • Bachelor's degree in Engineering, Construction Management, Architecture, or related field; equivalent experience considered.
  • 5+ years of experience in commissioning, QA/QC, construction management, MEP systems, or mission critical/data center projects.
  • Experience with HVAC, electrical, plumbing, controls, fire/life safety, and critical facility systems.
  • Knowledge of commissioning and quality standards, including ASHRAE, LEED, BCA, and applicable building codes.
  • Strong documentation, technical writing, communication, and stakeholder management skills.
  • Proficiency with Microsoft Office; commissioning and document control software experience preferred.


The salary range for this full-time role is $93,000.00-$124,000.02 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate's experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:
  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program

Similar Jobs

More Jobs at Cumming Group

More Information Technology Jobs

Find similar QA/QC/Commissioning Manager - Data Center Construction jobs: