Full Job Description
This position requires significant onsite presence in Charleston, SC with travel required based on project and client needs.
We're looking for candidates eager to lead complex mission-critical projects, influence project outcomes, and drive operational excellence across large-scale data center developments. Here's what will set you up for success at MGAC:
• 5+ years of experience in commissioning, construction management, mission-critical facilities, or data center infrastructure projects.
• 3+ years of experience managing commissioning teams, consultants, and multidisciplinary project stakeholders.
• Bachelor's degree in Engineering, Construction Management, Mechanical Engineering, Electrical Engineering, or a related technical field. Equivalent experience will be considered.
• Extensive experience supporting hyperscale, colocation, enterprise, or mission-critical data center construction projects.
• Experience leading Level 1-5 commissioning activities for complex MEP and critical infrastructure systems.
• Strong knowledge of electrical distribution, UPS systems, generators, HVAC systems, controls, BMS, EPMS, SCADA, and integrated systems testing.
• Excellent analytical, organizational, leadership, problem-solving, presentation, interpersonal, verbal, and written communication skills.
• Proven ability to manage multiple projects simultaneously while balancing schedule, budget, risk, quality, and client expectations.
• A collaborative leader who thrives in fast-paced environments and is passionate about delivering exceptional project outcomes.
What You'll Be Doing
MGAC's Critical Environments team manages some of the most complex and high-profile data center projects in the industry. As a trusted owner's representative, we help clients navigate technical challenges, mitigate risks, and ensure facilities are delivered ready for operations. As a Data Center Construction - Mid - Senior Commissioning Project Manager you will lead commissioning strategy and execution across large-scale mission-critical projects and serve as a key advisor to clients throughout the project lifecycle.
Commissioning Leadership
• Lead and manage commissioning teams including Commissioning Managers, Engineers, Project Managers, and third-party commissioning partners.
• Oversee commissioning activities across multiple concurrent data center construction projects.
• Develop commissioning strategies, resource plans, project schedules, and execution methodologies.
• Provide technical leadership throughout design, construction, testing, and turnover phases.
• Mentor and develop team members while promoting a culture of quality, accountability, and safety.
Commissioning Program Delivery
• Direct the full lifecycle of Level 1-5 commissioning activities.
• Review and approve commissioning plans, scripts, procedures, reports, and turnover documentation.
• Oversee equipment start-up, functional performance testing, integrated systems testing (IST), load bank testing, and operational readiness activities.
• Develop and maintain commissioning logs, deficiency logs, equipment checklists, SOPs, MOPs, and project documentation.
• Ensure consistency and compliance with company quality processes and commissioning standards.
Technical Oversight
• Lead commissioning efforts for critical infrastructure systems, including:
• Electrical distribution systems
• Medium- and low-voltage power systems
• UPS systems and battery plants
• Standby generators and fuel systems
• Chillers and cooling plants
• CRAH and CRAC units
• Building Management Systems (BMS)
• EPMS and SCADA systems
• Fire alarm and life safety systems
• Emergency power systems
• Review design documents, specifications, shop drawings, and equipment submittals for commissioning requirements.
• Support troubleshooting, issue resolution, and deficiency management during testing and startup activities.
• Verify testing results and ensure systems meet owner project requirements and operational objectives.
Client Relationship Management
• Serve as a trusted advisor and primary commissioning lead for clients and project stakeholders.
• Facilitate commissioning meetings, project reviews, and progress reporting.
• Coordinate activities among contractors, consultants, vendors, equipment manufacturers, and owner representatives.
• Proactively identify project risks and develop mitigation and recovery strategies.
• Maintain the client's vision while ensuring successful project delivery.
Our Critical Environments project work continues to experience tremendous growth, with a robust pipeline of hyperscale, colocation, and mission-critical projects across North America.
Salary Range
$110,000-$160,000 per year (commensurate with experience)
The advertised salary range is intended as a general guideline and may vary based on factors such as experience, expertise, certifications, and location. This base salary does not reflect the full compensation package, which may include bonuses, a 401(k) match, and other benefits.