As our Data Center Construction Manager (CM), you will be a part of a diverse, upbeat, and creative team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry-leading examples of energy efficient and cost-effective designs.
You will:
• Own project scope, quality, schedule, and budget for construction of new builds or general capital projects.
• Own construction project management and oversight of construction related activities.
• Work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
• Be a leader in your specific discipline (construction management, building services, architectural, electrical or mechanical engineering).
• Represent Amazon's owner's representative on construction sites daily, as, interacting with construction trades.
Key job responsibilities
• Be Amazon's construction representative on multiple data centers building and capital improvement construction project sites from construction start through hand-off to operations.
• Direct interface with construction general contractors during the construction bidding, award, execution, punch-list, and closeout phases.
• Create construction project scope and request for proposals.
• Conduct negotiations with general contractors and evaluate bids and proposals with detail and accuracy.
• Manage and drive cost, schedule, and quality while managing construction contractors and vendors.
• Perform construction project management activities, including management of documents, submittals, RFIs, change orders, invoices, quality, scope, and schedule.
• Drive construction teams to troubleshoot and perform root-cause failure analysis on equipment failures.
• Support commissioning and integrated system testing and oversight.
• Support operations of installed facilities, including review of procedures, best practices, and maintenance initiatives.
• Support capital request creation.
• Analyze and report construction progress and financials.
• Record and report key construction metrics to team members and management.
• Contribute to construction initiatives aimed at improving construction efficiency and increasing data center resiliency.
• Provide constructability reviews for electrical and mechanical designs for new or optimization of existing data centers.
BASIC QUALIFICATIONS
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field
- Experience carrying new design concepts through exploration, development, and into deployment or mass production
- Experience in MS Excel, Word, and Windows Operating Systems
- Experience with power management and power monitoring systems
PREFERRED QUALIFICATIONS
- 5+ years of project management in data centers or comparable critical infrastructure experience
- Knowledge of critical data center equipment
- Knowledge of engineering documentation, electrical diagrams and standard operating procedures
- Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, or OSHA
- Experience in project management in data centers or comparable critical infrastructure
- Experience in Data Center Engineering Operations, with a deep understanding of electrical and mechanical data center infrastructure
- Experience reading and interpreting construction specifications and drawings for all domains
The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.
USA, IN, Hobart - 111,300.00 - 186,100.00 USD annually