Senior Commissioning Manager - Data Center Construction

Cumming Group

$115K — $161K *
Real Estate & Construction
8 - 10 years of experience
Job Overview by Ladders

Qualifications

  • 5-10 years experience in commissioning HVAC, electrical, plumbing, and controls for data centers is required.
  • Strong capability in developing commissioning plans and final reports.
  • Familiarity with ASHRAE, LEED, and related technical standards is essential.
  • Excellent communication skills and stakeholder management experience are necessary.
  • Proficiency in Microsoft Office and Microsoft Project is required.

Responsibilities

  • Lead the commissioning process from project initiation to turnover.
  • Develop detailed commissioning plans and reports with optimization recommendations.
  • Review and ensure alignment of project documents with commissioning objectives.
  • Perform site observations to verify installation adherence to design intent.
  • Manage and resolve deficiencies throughout design and testing phases.
  • Witness and document functional performance testing and validate results.
  • Coordinate the development of standard operating procedures for critical facility operations.

Benefits

  • Comprehensive medical, dental, and vision insurance options.
  • 401(k) plan with matching contributions.
  • Generous paid time off and holidays.
  • Short and long-term disability coverage provided.
  • Access to an Employee Assistance Program.
Full Job Description
Cumming Group is currently hiring a Senior Commissioning Manager to be based in Dallas, TX. In this role, you will be responsible for overseeing the commissioning of large data center projects from design through testing and turnover and support measures for improved system energy efficiency savings, clean energy generation, and mechanical/electrical system management.

The Commissioning Manager verifies that designed, installed, and tested systems and equipment satisfy specified performance criteria and meet the client's operational requirements. This position is responsible for client satisfaction, project execution, business development support, and travel related to commissioning assignments.

Essential Duties & Responsibilities:
  • Lead and manage the commissioning process from project initiation through turnover, coordinating owners, design teams, contractors, vendors, and testing providers to ensure successful project delivery.
  • Develop Commissioning Plans and Commissioning Reports, which may include recommendations for optimizing building operations, functional checklists, deficiency logs, equipment operation and maintenance manuals.
  • Review Owner's Project Requirements (OPR) and Basis of Design (BOD) documents and verify alignment with project commissioning objectives.
  • Perform commissioning-focused reviews of design drawings, specifications, and material or equipment submittals at key project milestones and document findings, recommendations, and issue resolution.
  • Maintain commissioning issues logs and coordinate resolution of deficiencies identified throughout design, construction, startup, and functional testing. Track corrective actions and confirm resolution.
  • Perform periodic construction site observations to verify systems are being installed in accordance with design intent and requirements.
  • Verify completion of equipment startup activities, pre-functional checklists, TAB reports, and prerequisite documentation prior to functional performance testing.
  • Develop functional performance test scripts and procedures; witness and document functional performance testing performed by contractors, vendors, and testing providers. Verify testing is conducted in accordance with approved commissioning procedures; document results, observations, deficiencies, and corrective actions.
  • Review and validate contractor, vendor, and third-party testing reports for completeness, compliance, and consistency with commissioning requirements.
  • Verify completeness of project turnover documentation including training records, operation and maintenance manuals, as-built documentation, and system turnover packages.
  • Review, coordinate, and support development of Standard Operating Procedures (SOPs) and Methods of Procedure (MOPs) for critical facility operations and commissioning activities.
  • Perform fundamental and enhanced commissioning in support of client LEED goals.
  • Knowledge of building systems performance and solutions for reducing operational emissions.
  • Perform field energy audits and support development of ASHRAE Level audit reports.
  • Perform energy analysis on rates, and energy cost savings.
  • Identify and provide documentation for energy efficiency project opportunities contributing to Building or campus carbon emission reduction; specifically HVAC and Lighting systems.
  • Manage and provide analysis energy generation or clean energy and battery storage projects.
  • Support management of external resources as needed; schedule and direct periodic commissioning and related energy meetings; and attend construction and coordination meetings as required for each project.
  • Interface with clients, contractors, equipment vendors, testing providers, and internal project teams; execute project assignments; and collaborate with engineering, design, and project management staff to support successful project delivery.
  • This position may require travel throughout the U.S.


Knowledge & Skills Required:
  • Experience commissioning HVAC, electrical, plumbing, fire/life safety, controls, central utility plants, or mission critical facility systems for data center projects is required.
  • Experience developing commissioning plans, pre-functional checklists, functional performance test procedures, and final commissioning reports.
  • Understanding of relevant technical standards, industry organizations, and best practices, including ASHRAE, CCC (California Commissioning Collaborative), BCA (Building Commissioning Association), ASME (American Society of Mechanical Engineers), SMACNA (Sheet Metal and Air Conditioning Contractors' National Association), and LEED.
  • Strong technical writing, documentation management, and stakeholder coordination skills.
  • Ability to manage multiple commissioning projects simultaneously and effectively communicate with owners, design teams, contractors, and facility operators.
  • Demonstrated ability to monitor scope throughout the project and recommend adjustments when necessary.
  • Demonstrated ability to facilitate resolution of issues among owners, design teams, contractors, vendors, and operators while maintaining project schedule objectives.
  • Excellent written and verbal communication skills.
  • Experience using Microsoft Word, Excel, and Microsoft Project.


Preferred Education and Experience:
  • Bachelor's Degree in Electrical or Mechanical Engineering, Construction Management, or related field.
  • A minimum of 8-10 years' experience in the building commissioning process, start-up, facilities management, control systems, test and balance or MEP installation and retro-commissioning; energy related experience preferred.


#LI-VM1

The salary range for this full-time role is $115,700.00-$161,966.69 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate's experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:
  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program

Similar Jobs

More Jobs at Cumming Group

  • Senior Electrical Estimator
    $120K — $160K *
    Tennessee Ridge, TN 37178 (Houston County)
    Real Estate & Construction
    In-Person
  • Senior Electrical Estimator
    $120K — $160K *
    Remote
    Real Estate & Construction
    Remote in United States
  • Marketing Manager
    $95K — $126K *
    Los Angeles, CA 90011 (Los Angeles County)
    Business Services
    In-Person
  • Marketing Manager
    $95K — $126K *
    Remote
    Business Services
    Remote in California, US
  • Project Manager
    $115K — $153K *
    San Diego, CA 92154 (San Diego County)
    Real Estate & Construction
    In-Person

More Real Estate & Construction Jobs

Find similar Senior Commissioning Manager - Data Center Construction jobs: