We are currently hiring a Scheduler / Cost Controller in LaBella's Program Management Services Division at our client's office in Rochester, NY. This position can be remote/hybrid. Please note that work type and location may be determined by the Company's contractual obligations and could change based on our Client's requirements.
The Scheduler/Cost Controller is responsible for producing a variety of regular and ad-hoc reports in support of our project planning and control initiatives. Working closely with the project team, they play a key role in ensuring that policies, procedures, and standards are adhered to. The Scheduler/Cost Controller is responsible for developing, implementing, preparing, reconciling and maintaining valuable project control data and reports for projects. Scheduler/Cost Controller assists with meeting the client's objectives by preparing monitoring project and developer financial attributes, analyzing variances, and initiating corrective actions.
Salary Range: $76,000 - $102,000
The specific salary offered may be influenced by a variety of factors including but not limited to the candidate's relevant experience, education, and work location.
The Scheduler and Cost Controller is required to produce a variety of regular and ad-hoc reports in support of our project planning and control initiatives. Working closely with all functional departments, the Cost Controller plays a key role in ensuring that policies, procedures, and standards are adhered to.
- Verifying the accuracy of all cost information - including confirmation that costs have been properly coded and allocated to the project budget.
- Producing required accounting and project cost reports.
- Producing reports on deviations, under-runs and over-runs.
- Preparing forecasts and cost trend reports. Reviewing and evaluating trends and their impact on project costs.
- Monitoring project costs and commitment to budget and forecast.
- Maintaining change control and the change order register.
- Assessing progress measurement and developing/updating progress curves for progress reporting.
- Responsible for EVM during all project stages.
- Develop an Integrated Master Schedule of the project according to owner standards and approved scheduling tool.
- Develop and evaluate the activities in the Integrated Project Schedule that affect the project and be able to capture work that can be completed in six (6) month Look-Ahead increments including work on critical path, work with less than 2 weeks float, work that can be consolidated, and work required to support that which is compatible with other projects.
- Develop Project Sequence/Logic - preparation of project schedules that accurately identify the interrelationship of activities to be performed by the various disciplines and Third Party involvement in the project.
- Perform Current Schedule and Cost (EV, AC) vs. Performance Measurement Baseline, compare and highlight major activity deviations between the original baseline and the current plan based on monthly updates.
- Perform Critical Path Analysis, identify and analyze critical paths/activities to ascertain project completion in time and in budget, including forecasting delays and evaluation of alternative scenarios.
- Overall responsibility for providing guidance to other project personnel on good scheduling practices and techniques.
- Owner Manager Planning and Control will coordinate Scheduler-Cost Controller Group to ensure the accomplishment of the Portfolio planning and control goals.
- Scheduler-Cost Controller Group will work under Manager Planning and Control who will provide direction and oversight.
- Produce a variety of regular and ad-hoc reports in support of our project planning and control initiatives.
- Work closely with all functional departments, the Controller/Cost Analyst plays a key role in ensuring that policies, procedures, and standards are adhered to.
- Responsible for developing, implementing, feeding, reconciling and maintaining valuable project control databases and reports for projects.
- Manages and ensures the reconciliation of program controls data with financial and performance systems, coordinating with Project Managers.
- Verifies the accuracy of all cost information including confirmation that costs have been properly coded and allocated to the project budget.
- Producing required accounting and project cost reports.
- Producing reports on deviations, under-runs and over-runs.
- Preparing forecasts and cost trend reports.
- Reviewing and evaluating trends and their impact on project costs.
- Monitoring project costs and commitment to budget and forecast.
- Maintaining change control and the change order register.
- Assessing progress measurement and developing/updating progress curves for progress reporting. Responsible for EVM during all project stages.
- Responsible for journal entries when requested.
Requirements- Minimum 3 years of experience in Project Controlling and 4 years of experience in Construction Project Scheduling required
- Bachelor's degree preferred
- CAPM or PMI-SP Certificate or equivalent (requires client's approval)
- SAP experience required
- Primavera (preferred) and/or MS Project experience required
- Experience in the functional area under which it will be contracted: Substations, T&D, Gas-Hydro and OSG.
BenefitsBody, mind, and wallet-LaBella's benefits support a holistic approach to your health and wellness, creating the foundation for physical, mental, and financial well-being. Our benefit offerings cover the must-haves (healthcare and retirement), the just-in-cases (insurances and employee assistance programs), and the cherry-on-tops (fitness reimbursements, year-end incentive pay, and tuition assistance). Visit our website for more details on benefits listed below.
- Flexible Work Schedule
- Health/Dental Insurance
- 401k Plan with Employer Match
- Short & Long Term Disability
- Profit Sharing
- Paid Time Off
- Leadership Development Program
- Fitness Reimbursement
- Tuition Reimbursement
- Referral Bonus Program
- Wellness Program
- Team Building Events
- Community Service Events