Project Controls Manager and CPM Scheduler - Lake City Microgrid and CHPLC-ERP-04 | Lake City Microgrid and CHP | Awarded project recruiting
WORK LOCATION: Hybrid planning possible; regular Independence site presence and travel as project needs require
REQUISITION: LC-ERP-04
DUTY LOCATION: Lake City Army Ammunition Plant, Independence, Missouri
REPORTS TO: ERP Project Manager / Program Controls
EMPLOYMENT: ERP full-time, project-based position
CSS CAM LCAT: 242 - Senior Technical Manager (provisional classification)
PLANNED OPENINGS: 1
REQUIREMENT BASIS: Project execution and staffing plan; qualifications verified against assigned work
Position SummaryBuild and maintain the resource-loaded baseline, long-lead and outage logic, three-week lookaheads, critical path and recovery scenarios. Integrate RICHARD and OEM schedules and reconcile actual progress with ERP reporting.
What You Will Do- Develop a logically linked, resource-loaded CPM baseline covering Government reviews, permits, OEM drawings, fabrication, outages, construction, and testing.
- Challenge and integrate RICHARD, OEM, specialty subcontractor, and Government milestones into one controlled schedule.
- Maintain schedule narratives, monthly updates, progress basis, float trends, and near-critical-path analysis.
- Build three-week lookaheads with field leadership and test recovery scenarios before commitments are made.
- Link commissioning hold points, operator training, as-builts, and closeout to final acceptance.
Minimum Qualifications- Seven years scheduling large industrial or USACE construction; advanced Primavera P6 or equivalent, logic analysis and schedule narratives.
- Proven P6 schedule development and update experience on complex construction.
- Ability to analyze logic, progress evidence, calendars, and outage constraints.
- Ability to meet the applicable installation access, safety, information-handling, and assignment requirements.
Preferred Qualifications- AACE PSP or similar scheduling credential.
- USACE schedule submittal and integrated EPC commissioning experience.
- Relevant military, Tribal, apprenticeship, or nontraditional experience that demonstrates equivalent capability where the role permits it.
What Success Looks LikeAn accepted baseline and documented updates that reveal procurement, permitting, and outage risk early.
Field, Travel and Employment Conditions- Work at an operating industrial installation may involve outdoor weather, uneven ground, stairs or ladders, construction noise, PPE, and coordination around ongoing plant operations. The actual essential functions will be reviewed for the assigned role.
- Project needs may include scheduled outages, factory testing, startup travel, or occasional weekend and alternate-shift work, subject to employer policies and approved site plans.
- Final assignment follows approved work packages, qualifications, installation access, and project authorization. Personnel who handle FCI/CUI must use only approved systems and procedures.
- ERP will provide the approved compensation range, benefits, and any travel terms through its normal hiring process. The internal CSS compensation category is not a promise of a particular rate.
Application Materials- Resume with month/year dates, employers, responsibilities, and relevant project types.
- Current licenses, training, trade qualifications, or certifications needed for the assigned work, with expiration dates if applicable.
- A concise example of comparable work, availability to work in Independence, and earliest possible start after NTP. References may be requested later.