Gray

Construction Schedule Manager

Gray$100K — $150K *
Real Estate & Construction
8 - 10 years of experience
Job Overview by Ladders

Qualifications

  • Bachelor's degree required.
  • Minimum of 10 years' experience in construction scheduling.
  • Strong understanding of food and beverage manufacturing project components.
  • Proficient in Microsoft Project and Primavera software.
  • Basic computer skills including word processing and spreadsheets.

Responsibilities

  • Prepare, communicate, and validate project schedules.
  • Maintain and update schedules throughout project duration.
  • Monitor project trends and notify management of implications.
  • Collaborate across different project workstreams on schedule implementation.
  • Travel to various job sites as required.

Benefits

  • Collaborative team environment fostering professional development.
  • Opportunity to work on innovative and diverse projects.
  • Engagement in both design and construction phases of major projects.
  • Access to continuous learning in cutting-edge construction technology.
Full Job Description
Overview

Gray Construction is seeking a Construction Schedule Manager to join our team. Experience in Construction Industry is required.

Responsibilities

Who we want

A qualified scheduler with a minimum of 10 years' experience and a bachelor's degree. Must understand the logic relationships between the various components of turnkey food and beverage manufacturing projects. The ideal candidate will have a fundamental understanding of design, process design, procurement, processing, packaging, material handling and building systems. This candidate will need the ability to generate schedules using process flow diagrams (PFDs), process and instrumentation diagrams (P&IDs) as well as traditional construction documents. Once a general construction sequence is established, this candidate will need to possess the leadership skills to communicate and implement the approach across all project workstreams.

Must be technically capable and experienced in the use of the most recent version(s) of Microsoft Project and Primavera. Must possess basic computer skills including the ability to utilize word processing, spreadsheets, software and e-mail. The selected candidate will have excellent communication skills. Must be physically present in the Lexington office.

The new team member should be an energetic, self-motivated individual who enjoys a team environment, as well as a passion for collaboration and professional development. If you are a high achiever striving to exceed expectations in a fast-paced innovative company, then Gray is the place for you.

Qualifications

What we expect

  • Responsible for providing schedule preparation, communication, review, validation and interpretation during the design, construction, commissioning and start-up of multiple manufacturing projects.
  • Responsible for ensuring that schedules are produced, maintained, updated and issued on a regular basis during the duration of the projects.
  • Responsible for monitoring trends and alerting management as to possible, both positive and negative, effects of those trends.
  • Required to travel to jobsites as necessary.


Physical Demands & Work Environment

The physical demands described here are representative of those that must be met by a team member to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.

While performing the duties of this position, the team member is frequently required to stand, walk, sit, use hands, reach with hands or arms and talk or hear. They may occasionally be required to climb or balance, stoop, kneel, or crouch. Must occasionally lift and/or move up to 50 pounds. Specific vision abilities required include close vision.

Generally, normal office environment where noise level is moderate and temperature/humidity is controlled. Overtime may be required.

Supervisory Responsibilities

This position does not have any supervisory responsibilities.

The wage range for this role takes into account a wide range of factors that are considered in making compensation decisions including but not limited to skill sets; experience and training; certifications; as well as other business and organizational needs. The disclosed range estimate has not been adjusted for the applicable geographic differential associated with the location at which the position may be filled. It is not typical for an individual to be hired at or near the top of the range for their role and compensation decisions are dependent on the facts and circumstances of each case. A reasonable estimate of the current range is $100K to 150K.

#LI-SL1

About Gray

Gray Television, Inc. is a television broadcast company headquartered in Atlanta, Georgia, United States. Established in 1946 by James Harrison Gray as Gray Communications Systems, the company owns or operates 145 stations across the United States, based primarily in small- and medium-sized markets. It also owns video program production, marketing, and digital businesses including Raycom Sports, Tupelo-Raycom, and RTM Studios, the producer of PowerNation programs and content. Gray Television is the second-largest television broadcaster in the United States by number of stations owned and operated, behind Nexstar Media Group.
Learn more about Gray
Size
10,000 employees
Industry

Similar Jobs

More Jobs at Gray

More Real Estate & Construction Jobs

Find similar Construction Schedule Manager jobs: