Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments.
Why This Role Stands Out
This is not a checklist-driven commissioning role.
This is a position for someone who:
• Owns outcomes, not just tasks
• Understands systems holistically, not in silos
• Can operate independently while leading others
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.
What You'll Do
Project Leadership & Execution
• Lead commissioning activities across the full project lifecycle
• Execute and oversee functional testing, factory witness testing, and on-site validation
• Manage multiple assignments while maintaining schedule, budget, and quality expectations
• Interpret contract documents to identify risks and opportunities
Technical Expertise & Problem Solving
• Evaluate electrical distribution systems and building system interconnectivity
• Troubleshoot system performance issues in real time
• Review design documentation and submittals
Client & Stakeholder Engagement
• Lead commissioning meetings and communicate findings
• Serve as a trusted partner to clients and contractors
Operational Contributions
• Complete field reports, documentation, and time management
• Support scheduling and revenue targets
Team Development
• Mentor junior engineers and support training initiatives
What You Bring
Core Qualifications
• Electrical Engineering degree or Qualified Electrician background
• 7+ years in electrical systems OR 3+ years commissioning
• Data center or mission-critical experience
Technical Capabilities
• Experience with electrical distribution, HVAC systems, controls, fire alarm, and automation
• Ability to read construction drawings and specifications
Professional Skills
• Strong analytical and communication skills
• Ability to lead meetings and manage multiple priorities
Physical Requirements
• Ability to work in field environments, climb ladders, and lift ~30 lbs
Preferred
• EIT, CEM, LEED, OSHA 30, BIM experience
Travel Requirements
Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required.
Salary range: $130,000 to $180,000