Rosendin Electric, Inc

Director of Engineering - Data Center Construction

Rosendin Electric, Inc$166K — $218K *
Tempe, AZ 85281In-Person
Real Estate & Construction
11 - 15 years of experience
Job Overview by Ladders

Qualifications

  • Bachelor’s degree in electrical engineering, architectural engineering, construction sciences, or related discipline.
  • 12 years of relevant work experience, combining education, training, and practical experience.
  • Registration as a licensed Professional Engineer (P.E.) in the US is required.
  • Advanced knowledge of building systems electrical engineering, manufacturing, or technology.
  • Effective communication skills for interaction at all organizational levels.

Responsibilities

  • Report to senior leadership and engage in high-level planning for engineering functions.
  • Develop and manage regional engineering operations, anticipating team needs.
  • Recruit, train, and deploy staff across the region.
  • Oversee HR and budgeting for the regional engineering group.
  • Develop and present proposals, securing work for the firm.
  • Direct initial engineering phases for large or high-risk projects as needed.
  • Manage project close-out and quality assurance processes.

Benefits

  • Employee Stock Ownership Plan (ESOP).
  • 401K retirement plan.
  • Annual performance-based bonus program.
  • 17 paid time off days plus 10 paid holidays annually.
  • Comprehensive medical, dental, and vision insurance.
  • Life insurance options including Term Life and AD&D.
  • Disability income protection insurance.
  • Pre-tax flexible spending plans for health and dependent care expenses.
  • Charitable giving match through the Rosendin Foundation.
Full Job Description

The Director of Engineering is an engineering management position that is responsible for providing complete oversight for the direction, planning, management and ongoing engineering operations on a regional basis. Provide input on strategic decision making and processes to the VP, Engineering and other Directors and Officers.

WHAT YOU’LL DO:
  • Reports directly to the Senior Director or Vice President, Engineering and participate in senior manager planning including engineering, detailing/modeling and principal engineering (non-production or not design related) work for the firm.

  • Develops and oversees the Engineering operation in their region of responsibility..Candidate is able to anticipate, plan and map group, team and staff skills to the work

  • Recruit train and deploy staff throughout thier region of responsibility.

  • Responsible for the HR and budgetary oversight for the Regional Engineering group.

  • Ability to develop proposals and meet, present and secure work on behalf of the firm either alone or in concert with of others in the firm.

  • Directs preliminary engineering activities, such as the project development, programming or schematic design phase of work, when needed with a focus on large value or high risk work.

  • Directs delicate or significant project close-out, installation or manufacturing QA/QC or testing/commissioning operations on behalf of the Operations group.In short, firefight.

  • May be tasked to act as the firm’s emissary for dispute resolution or sensitive client work or negotiations.

  • Ability to work independently with little direction based on the operating business plan and financial controls.

  • Ability to take executive-level guidance and develop a complete action plan for the required deliverables or project.This would encompass situations with murky or conflicting guidance or goals.

  • Develops or oversees complex and interrelated project-specific work, such as sequence of operations, equipment/system testing scripts or complex engineering products.

  • Visit project locations to ascertain existing conditions, perform feasibility studies, test factory-built systems prior to shipment and conduct field investigations as requested by the Operations Team..

  • Conducts value engineering evaluations to fully engineered designs.

  • Ability to evaluate project/system design criteria with budgetary issues.

  • Extensive knowledge of equipment and fluency in electrical system testing and commissioning is preferred.

  • Supports the firm’s Pre-Construction efforts, especially in the fields of Estimating and Business Development.Assist in the identification and development of leads and closing of new work.Has the ability to maintain external customer relationships throughout the term of the relationship or project.

  • Ability to review and contract requirements.

  • The duties and responsibilities are intended to describe the general nature and scope of work being performed by this position. This is not a complete listing and other duties will be assigned based on the positions role within the business unit.

WHAT YOU’LL NEED TO BE SUCCESSFUL:
  • Advanced knowledge of all aspects of building systems electrical engineering, manufacturing or technology is required

  • Advanced management skills are required, including work planning, resource management, fee development, staff oversight, staff development and advancement planning.

  • Advanced knowledge of equipment and system testing and commissioning.The ability to analyze and resolve technically complex engineering problems.

  • Proficient in using a computer and Microsoft Office (Outlook, Word, Excel, etc.); Oracle preferred

  • Ability to prioritize and manage multiple tasks, changing priorities as necessary

  • Ability to work under time pressure and adapt to changing requirements with a positive attitude

  • Effective oral and written communication skills as required for the position

  • Ability to be self-motivated, proactive and an effective team player

  • Ability to interact effectively and professionally with all levels of employees, both management and staff alike, vendors, clients, Trade Partners, and others


WHAT YOU BRING TO US:
  • Bachelor’s degree from an accredited university or college in electrical engineering, architectural engineering, construction sciences, or related discipline.

  • Typically requires 12 years of related work experience - Can be a combination of education, training and relevant experience

  • Registration as a licensed US-based Professional Engineer (P.E.) is required for this position.


TRAVEL:
  • Up to 50%


WORKING CONDITIONS:
  • General work environment – sitting for long periods, standing, walking, typing, carrying, pushing, bending. Work is conducted primarily indoors with varying environmental conditions such as fluorescent lighting and air conditioning

  • Noise level is usually low to medium; it can be loud on the jobsite.

  • Occasional lifting of up to 30 lbs.


YOU Matter – Our Benefits
  • ESOP – Employee Stock Ownership

  • 401K

  • Annual bonus program based upon performance, profitability, and achievement

  • 17 PTO days per year plus 10 paid holidays

  • Medical, Dental, Vision Insurance

  • Term Life, AD&D Insurance, and Voluntary Life Insurance

  • Disability Income Protection Insurance

  • Pre-tax Flexible Spending Plans (Health and Dependent Care)

  • Charitable Giving Match with our Rosendin Foundation

Pay Range

$166,300.00-$218,300.00 Annual

The pay range for this role is what we expect to pay for candidates that meet the specified qualifications and requirements listed on this job description. Candidate’s pay can vary based on location, job-related experience, skills, and education.

Our success is rooted in our people. We all come together around long-term vision and a sense of shared ownership. As a group, we do whatever it takes to ensure the success of our business…and your career.

About Rosendin Electric, Inc

Rosendin Electric, Inc. is an employee-owned electrical contractor headquartered in San Jose, California. The company provides electrical engineering, design-build, and construction services for commercial, industrial, and institutional clients. Rosendin Electric was founded in 1919 and has completed projects in the United States, Canada, and Mexico. The company has been recognized as one of the largest electrical contractors in the United States by Engineering News-Record.
Learn more about Rosendin Electric, Inc
Size
7,000 employees
Industry
Founded
1919

Similar Jobs

More Jobs at Rosendin Electric, Inc

More Real Estate & Construction Jobs

Find similar Director of Engineering - Data Center Construction jobs: