Datacenter Construction Project Manager (Full-Time)

MBP

$122K — $185K *
Dhs, MD 20588In-Person
Real Estate & Construction
8 - 10 years of experience
Job Overview by Ladders

Qualifications

  • 10+ years of experience in the construction industry, especially with MEP systems.
  • Strong background in managing projects involving laboratory and secure environments.
  • Progressive career in quality control and assurance within construction management.
  • Bachelor's degree in engineering or related field preferred.
  • Certifications in Construction Quality Management or similar are highly regarded.

Responsibilities

  • Provide owner representation for medium- to large-scale construction projects.
  • Proactively identify and mitigate risks with the project delivery team.
  • Verify completeness and feasibility of project schedules.
  • Lead progress meetings and ensure accurate documentation is prepared.
  • Conduct quality assurance inspections to confirm compliance with contracts.
  • Track and resolve project issues collaboratively with stakeholders.
  • Oversee commissioning and coordinate project closeout requirements.

Benefits

  • Competitive compensation with potential for semi-annual bonuses.
  • Generous Paid Time Off and holiday schedule.
  • Comprehensive health benefits fully covered for individuals.
  • 401(k) plan with company match and Health Savings Account contributions.
  • Tuition assistance and student loan reimbursement programs.
  • Extensive professional development and training opportunities.
  • Employee wellness and fitness program reimbursement.
Full Job Description
Overview

EXPERIENCE QUALIFICATION:

MBP is seeking leaders in the design and construction industry to support the delivery of complex projects and programs. For this position, we seek candidates in the Washington/Baltimore DC metropolitan area with 10 or more years of combined education and/or experience and demonstrated advanced knowledge and expertise in the installation of complex Mechanical, Electrical, Plumbing, and/or related systems. Experience in supporting the successful delivery of new and/or renovated laboratory, data center, and/or secure facilities with SCIFs is desired. Evidence of progressive career development and demonstrated expertise in quality control, quality assurance, construction management, field engineering, or related fields.

Responsibilities

MAIN DUTIES:

Duties include providing pre-construction and on-site owner representation for medium- to large-scale construction projects, either as part of a team or working independently, depending on the project's size and complexity. Responsibilities include managing cost, schedule, and/or quality on behalf of the client/owner. Typical duties include:
• Working collaboratively with the project delivery team to proactively identify risks and issues and develop mitigation strategies.
• Reviewing project schedules to verify they are complete, feasible, and reasonable. Specific scheduling experience is not required, but it is desired.
• Reviewing and tracking progress against the accepted schedule.
• Participate and/or lead progress meetings. Prepare meeting minutes or review meeting minutes prepared by others to verify completeness and accuracy.
• Provide quality management, including participation in preparatory/pre-installation meetings, and perform or oversee the performance of Quality Assurance (QA) inspections to verify that work is being performed in compliance with contract requirements.
• Document and track issues until resolution, including working collaboratively with the contractor, designer, and owner to resolve issues as they arise.
• Review change order proposals for entitlement and price, and lead or assist in negotiations.
• Coordinate and oversee commissioning agent and other third-party owner contractors.
• Coordinate punchlist and acceptance with the designer and other project stakeholders.
• Monitor and verify completion of closeout requirements, including owner training, operations and maintenance manuals, warranties, and stock materials.

Qualifications

EDUCATION/KNOWLEDGE:
• High school or General Equivalency Diploma (GED), plus 15 years of related experience and/or education.
• Bachelor's degree in engineering, architecture, construction management, or related field, plus 10 years of related experience
• Possess OSHA 30-hour certification or obtain within 3 months of hire.
• Working knowledge of basic mathematics, including computations based on field measurements.
• Considerable construction-related training or a combination of education and experience that demonstrates the ability to perform the job.
• Knowledge of codes, materials, methods, and tools utilized in construction, repair, or renovation work.
• Preferred certifications include CQM (Construction Quality Management), CCM (Certified Construction Manager), Journeyman or Master certification/license.
• Knowledge of construction practices, principles of construction management and project controls, with working knowledge in areas including scheduling, cost estimating, documentation, contract administration, and construction techniques.

SKILLS AND ABILITIES:
• Ability to work independently and handle all aspects of a project, including client interface, technical issues, documentation, and reporting.
• Exercises tact and diplomacy in dealing with sensitive and complex issues and situations.
• Ability to identify potential problems and derive recommended solutions from past experiences.
• Specialized expertise with quality assurance and quality control techniques.
• Must have computer skills and be proficient in using Microsoft Office applications, Email, Internet navigation, web-based tools, and other specialized equipment.
• Ability to read and interpret plans and contract specifications.
• Ability to communicate quality issues effectively and responsibly (verbally and in writing) with internal and external customers (i.e., contractors, owners, subconsultants, designers, architects, and fellow team members).
• Ability to obtain and maintain required certifications.
• Ability to stand and sit as needed on project work sites, climb ladders, work at heights, and work outdoors in a wide range of weather conditions.
• Ability to safely navigate construction work sites with uneven terrain.

SPECIAL REQUIREMENTS:
• Criminal history background check, reference verification, and work history will be required prior to employment.
• Must be a US Citizen

STATUS:

Full-time

The base salary range for this position is $122,000.00 to $185,000.00. Actual compensation will be determined based on work location, qualifications, experience, job-related skills, and relevant education or training.

BENEFITS:
  • Competitive compensation with opportunities for semi-annual bonuses
  • Generous Paid Time Off and holiday schedules
  • 100% Employer paid medical, dental, vision, life, AD&D, and disability benefits (for individual)
  • Health Savings Account with company contribution
  • 401(k)/Roth 401(k) plan with company match
  • Tuition Assistance and Student Loan Reimbursement
  • Numerous Training and Professional Development opportunities
  • Wellness Program & Fitness Program Reimbursement


Applicants must be authorized to work in the U.S. without sponsorship.

Similar Jobs

More Jobs at MBP

More Real Estate & Construction Jobs

Find similar Datacenter Construction Project Manager (Full-Time) jobs: