Change Order Estimator II

Vigor, LLC

• $97K — $110K *
Aerospace & Defense
Less than 5 years of experience
Job Overview by Ladders

Qualifications

  • Associate degree in Engineering Technology, Construction Management, or related field preferred; equivalent experience accepted.
  • 2-5 years of experience in estimating, planning, or project management within NAVSEA ship repair or heavy industrial construction.
  • Knowledge of NAVSEA ship repair and modernization processes.
  • Strong analytical and organizational skills with a focus on accuracy in cost estimates.
  • Ability to interpret technical drawings, specifications, and contracts.

Responsibilities

  • Review Requests for Contract Changes (RCCs) and other contract modifications.
  • Perform ship checks and onboard inspections for scope validation.
  • Develop detailed estimates for labor, materials, and subcontractor work.
  • Prepare comprehensive Basis of Estimate (BOE) documentation and pricing assumptions.
  • Collaborate with cross-functional teams to validate estimates and support proposals.
  • Solicit and assess supplier and subcontractor quotations.
  • Track the proposal process from estimates to submission and negotiations.

Benefits

  • Medical, Dental, and Vision plans.
  • Life, AD&D, LTD, and STD insurance.
  • Discretionary bonus opportunities.
  • Tuition Reimbursement for continuing education.
  • Comprehensive 401(k) plan with employer contribution.
Full Job Description
PAY RANGE: $97,000 - 110,000

POSITION SUMMARY:

The Change Order Estimator II supports the successful execution of U.S. Navy ship repair and modernization programs by preparing accurate, timely, and fully supported cost estimates and pricing proposals for Requests for Contract Change (RCCs), Requests for Equitable Adjustment (REAs), Undefinitized Contract Actions (UCAs), and other contract modifications. Working closely with Program Management, Contracts, Engineering, Planning, Production, Scheduling, Procurement, and Quality Assurance, the Estimator I develops detailed Basis of Estimate (BOE) documentation, validates technical scope through ship checks, and supports customer negotiations throughout the proposal lifecycle.

ESSENTIAL FUNCTIONS AND MAJOR RESPONSIBILITIES:

(This list is not intended to detail all aspects of the assigned work but is representative of the job's overall responsibilities.)
  • Review RCCs, contract modifications, engineering changes, growth work, customer requests, and technical direction.
  • Interpret NAVSEA work items, Standard Items, 4E Specifications, SIDs, drawings, technical manuals, and contract requirements.
  • Perform ship checks and onboard inspections to validate scope, access, production methods, and estimating assumptions.
  • Develop detailed bottoms-up labor, material, subcontractor, equipment, testing, temporary service, engineering, planning, and schedule impact estimates.
  • Prepare complete Basis of Estimate (BOE) documentation, pricing narratives, assumptions, exclusions, and supporting calculations.
  • Coordinate with Engineering, Planning, Production, Scheduling, Procurement, Contracts, QA, and Project Management to validate estimates.
  • Solicit and evaluate supplier and subcontractor quotations.
  • Maintain historical estimating data and estimate files for audit readiness.
  • Track estimates from receipt through proposal submission, negotiation, award, and implementation.
  • Support technical fact-finding meetings and customer negotiations by explaining estimate assumptions, methodologies, production approaches, schedule impacts, and pricing rationale.
  • Assist Program Managers and Contracts personnel with proposal revisions, customer questions, and negotiation actions.
  • Identify growth opportunities and schedule impacts during project execution.
  • Ensure compliance with FAR, DFARS, NAVSEA requirements, company procedures, and contractual obligations.


JOB SCOPE:

Operates within established estimating procedures while exercising sound judgment and independent decision-making appropriate for an Estimator I. Responsible for developing accurate estimates for assigned work packages and supporting negotiations. Errors in estimating, technical interpretation, or proposal documentation may significantly affect project profitability, schedule, customer confidence, and future business opportunities.

SUPERVISORY RESPONSIBILITY

None. May coordinate with cross-functional teams and provide technical estimating support during proposal development.

INTERPERSONAL CONTACTS

Works closely with Program Managers, Project Engineers, Production Supervision, Planning, Scheduling, Procurement, Contracts, Quality Assurance, Engineering, suppliers, subcontractors, and Government representatives. Represents the company professionally during ship checks, technical reviews, fact-finding sessions, and customer negotiations.

KNOWLEDGE SKILLS AND ABILITIES:
  • Knowledge of NAVSEA ship repair and modernization processes.
  • Ability to read technical drawings, specifications, work items, and contracts.
  • Strong analytical, mathematical, and organizational skills.
  • Ability to prepare accurate BOEs and cost estimates.
  • Strong verbal and written communication skills.
  • Ability to support customer negotiations and explain estimating methodologies.
  • Proficiency with Microsoft Office Suite (Excel, Word, Outlook) and Bluebeam; ERP and estimating software preferred.
  • Ability to manage multiple priorities in a fast-paced environment.


EDUCATION AND/OR EXPERIENCE:
  • Associate degree in Engineering Technology, Construction Management, Marine Engineering, Business, or a related field preferred; equivalent shipyard experience may be substituted.
  • Two (2) to five (5) years of estimating, planning, project engineering, production, quality assurance, ship superintendent, or project management experience in NAVSEA ship repair, shipbuilding, or heavy industrial construction preferred.


CERTIFICATES, LICENSES AND REGISTRATIONS:

None required.

PHYSICAL DEMANDS:

Work is conducted in both office and industrial shipyard environments. The employee must be able to board vessels, climb ladders, access confined spaces, wear required PPE, and occasionally lift up to 25 pounds. Local travel between facilities and customer locations may be required.

WORK ENVIRONMENT:

Regular exposure to shipyard production facilities, dry docks, and pier-side operations. May be exposed to varying weather conditions, industrial noise, dust, welding operations, and other shipyard hazards while performing ship checks and supporting production activities.

CITIZENSHIP: Pursuant to a government contract, this specific position requires US citizenship.

Vigor Industrial LLC and its wholly owned subsidiaries are drug, smoke and vape-free workplaces. Prospective employees must pass a drug and alcohol test and background check as pre-employment screening.

At Vigor we offer a generous benefits package that includes:

Medical

RX

Dental

Vision

Life

AD&D

LTD

STD

EAP

Discretionary bonus

Tuition Reimbursement

FSA (Medical, Childcare, Transportation)

10 paid holidays

PTO

401(k)

Similar Jobs

More Jobs at Vigor, LLC

More Aerospace & Defense Jobs

Find similar Change Order Estimator II jobs: