Code Red Safety is looking for a Safety Manager for a construction project in Red Oak, TX.This role will begin ASAP and work is anticipated to run for approximately 6 months working 50-60 hours per week.
Local candidates only as there is no per diem available.Applicants MUST meet the following requirements:- Have 5+ years of field safety experience.
- Must have at least one of the following:OSHA 30, OSHA 510, OSHA 500, CSST, CHST, CSHO or similar
- Must be computer savvy
- Bilingual preferred
- Past electrical safety experience a plus
- Have a valid FA/CPR card.
- Must be able to pass a drug test & background check.
If you meet the above qualifications, please apply.If you are determined to be a good candidate for this position, we will be in touch to discuss additional details.