Quality Manager - Data Center Construction

Yates Construction

$80K — $95K *
Real Estate & Construction
Less than 5 years of experience
Job Overview by Ladders

Qualifications

  • Associate or undergraduate degree in Quality Management, Construction Management, Engineering, or similar field preferred.
  • Minimum 3 years of experience in construction quality control supervision.
  • Minimum 5 years of experience in industrial and/or commercial construction.
  • Experience with implementing large and complex quality plans.
  • In-depth knowledge of Construction Standards and Best Practices.

Responsibilities

  • Collaborate with project manager and subcontractors to ensure 100% compliance.
  • Conduct site inspections and ensure construction meets quality standards.
  • Develop and manage project-specific quality management plans.
  • Train project team members on quality-related risks and solutions.
  • Maintain records and documentation of quality control activities.

Benefits

  • Opportunity to work with a leading construction firm.
  • Engage in diverse projects with a focus on quality management.
  • Professional development and training opportunities.
  • Supportive work environment emphasizing corporate ethics.
  • Participation in workplace safety programs.
Full Job Description
Position: Quality Manager - Data Center Construction

Location: Wichita Falls, TX

Job Summary:

Provides leadership, coordination, guidance, and technical expertise in all areas of quality. Responsible for the overall daily operations of quality. Develops and administers quality related policies, procedures, techniques, initiatives, to ensure that all quality policies and practices are followed consistently on the project. Responsible for the overall daily operations of quality.

Primary Duties:
  • Works with project manager, superintendents, and subcontractors in developing processes and procedures that effectively accomplish the goal of 100% compliant work that exceeds expectations
  • Collaboration among project team and subcontractors
  • Acts as an advocate for Yates Construction by maintaining good corporate ethics and promoting quality, at every opportunity, as a core value of the organization
  • Maintains active relationships with engineers, consultants, and industry association
  • Assists teams with developing a project specific quality management plan
  • Supports and follows up to ensure that project teams are following their project specific quality management plan
  • Builds and maintains system templates for various DFOW activities conducted
  • Prepare DFOW for project, as required in Quality Management Plan
  • Participates in project meetings
  • Conducts site visits and inspections of work in place
  • Assists teams with plan and constructability reviews
  • Read and understand specifications, reference codes and standards
  • Review and interpret contract drawings
  • Provides training and coaching for project team members to identify key project risks, related to quality
  • Assist team with risk prevention planning and follow up
  • Works closely with the Quality and Construction Science Department to ensure that we are utilizing advancements in technology to support operational excellence and reduce risk on projects
  • Act independently as CQCM while coordinating all QC functions so as not to delay construction scheduling
  • Determine, communicate, and document deficiencies and ensure they are corrected in a timely manner (NCR Log)
  • Maintain current records providing factual evidence that required quality control activities and / or test have been performed
  • Identifies and resolves problems in a timely manner, gathers and analyzes information skillfully; develops alternative solutions; works well in group problem solving situations uses reason even when dealing with emotional topics
  • Review shop drawings and submittals for conformance with project specifications and contract requirements
  • Initiate three phase inspection process
  • Conduct daily observations to ensure that all three phases of inspection are undertaken and implemented as designed and document all results
  • Examine the work area to assure that all required work has been completed and is following the contract requirements and resolve any differences
  • Conduct and Chair Preparatory Meetings
  • Chair and document weekly QC meetings with internal and external stakeholders (Yates and subcontractors quality representatives) and external team members
  • Verify and document that all matters received for the project are in conformance with the approved submittal, are handled and stored appropriately, and are acceptable for use
  • Oversee daily and weekly QC/QA reports that reinforce activities that are being constructed in conformance with established standards
  • Demonstrate Yates Core Values and Principles
  • Follow Yates Code of Conduct
  • Safety Responsibilities and Expectations
    • Responsible for refusing unsafe work and for carrying out all work in accordance with the established Yates Safety Procedures and Work Practices
    • Report all incidents, near hits and hazards to management.
    • Required to wear and maintain personal PPE.
    • Advise fellow employees of hazardous situations.
    • Participate in workplace inspections.
    • Comply with statutory requirements, including duty of care.
    • Participate in required and/or assigned training.
    • Provide suggestions to improve Safety.
    • Present a mature approach to working safely.
    • Attend prestart and Safety meetings and contribute.
    • Assists with administering the site safety program as required and ensuring Trade Partner compliance with OSHA standards and Yates Site Specific Requirements and all applicable safety codes and regulations.
  • Other related duties as needed and assigned by the Manager in support of the successful completion of the project.

Qualifications:
  • An associate or undergraduate university degree or higher (preferably in Quality Management, Construction Management, Engineering, or a closely related field) is preferred
  • Other relevant education, training or work experience may substitute for bachelor's degree
  • Minimum of three (3) years of construction experience as a part of a quality control supervision
  • Minimum of five (5) years industrial and/or commercial construction experience
  • Experience with large/complex quality plan implementation

Requirements:
  • In-depth knowledge of the Construction Standards and Best Practices
  • Working knowledge of the International Building Code Knowledge and experience of diverse project type
  • Computer skills using Procore, Viewpoint, SharePoint, MS Office


Physical Demands/Essential Job Functions:

This job description reflects an assignment of essential functions; it does not prescribe or restrict the tasks that may be assigned. Physical requirements for this role may include but not limited to walking, standing, operating tools / equipment, and lifting items (up to 25lbs).?? Tasks may also be carried out in varying weather conditions and environments as appliable to the position.?

Similar Jobs

More Jobs at Yates Construction

More Real Estate & Construction Jobs

Find similar Quality Manager - Data Center Construction jobs: