Low Voltage QA/Security Cx Associate (Owner's Representative) - Data Center Construction

KALCON

$100K — $150K *
Real Estate & Construction
Less than 5 years of experience
Job Overview by Ladders

Qualifications

  • Bachelor's degree in Construction Management, Electrical Engineering, or related field preferred; equivalent field experience accepted.
  • Minimum 4 years in low voltage infrastructure, focusing on cable tray, conduit, and equipment installation.
  • Experience in mission critical or high-tech construction projects.
  • Familiarity with security, network/WAP, and controls cabling systems.
  • Knowledge of commissioning processes and experience with documentation on platforms like Cx Alloy.
  • Strong grasp of installation quality standards and workmanship practices.
  • Proficient in construction management software, such as Procore or Autodesk Construction Cloud.

Responsibilities

  • Conduct field inspections to ensure low voltage systems are installed as scheduled.
  • Assess installation quality for compliance with design documents.
  • Document inspection findings and confirm corrective actions through software platforms.
  • Collaborate with support teams for onsite oversight and coordination.
  • Oversee installation processes for Outside Plant (OSP) and Inside Plant (ISP) pathways.
  • Inspect and confirm readiness of conduits and network rooms before equipment installation.
  • Coordinate commissioning efforts for security systems and manage punch list resolutions.

Benefits

  • Comprehensive medical, dental, and vision insurance.
  • 401(k) retirement plan with a 4% company match after employee contributions.
  • 15 days of paid time off annually.
  • 8 paid National Holidays.
  • Reimbursement for professional licenses and certifications.
Full Job Description
Seeking a Low Voltage QA/Security Cx Associate to provide Owner Representation on the construction of a data center campus - Turkey, TX.

Minimum Qualifications:
- A four-year degree in Construction Management, Electrical Engineering, or a related field is preferred.
- In lieu of a degree, equivalent field experience in low voltage systems installation and supervision will be considered.
- Minimum of 4 years of experience in low voltage infrastructure, including cable tray, conduit, and equipment installation.
- Experience supporting mission critical or high-tech construction projects.
- Familiarity with security, network/WAP, and controls cabling systems.
- Experience with commissioning processes, including script assignment and documentation in platforms such as Cx Alloy.
- Strong understanding of installation quality standards, labeling protocols, and clean workmanship practices.
- Proficiency in construction management software such as Procore or Autodesk Construction Cloud (ACC).
- Excellent communication and coordination skills across disciplines and vendors.
- Ability to manage punch list resolution and ensure timely corrective actions.

Tasks and Responsibilities:
Field Oversight & Inspection
- Conduct field inspections to verify that low voltage systems installation is progressing according to schedule.
- Assess installation quality to ensure compliance with design documents.
- Document findings using platforms such as Procore or Autodesk Construction Cloud (ACC) and follow up to
confirm completion of corrective actions.
- Collaborate with Q-Systems support to provide onsite oversight, direction, and coordination across disciplines.
Pathways
- Oversee installation of Outside Plant (OSP) and Inside Plant (ISP) pathways.
- Monitor base building low voltage cable tray installation.
- Inspect conduit rough-in for compliance and readiness.
- Ensure network rooms are prepared for equipment installation and meet design specifications.
Low Voltage Cable & Equipment Installation
Oversee installation of cabling for:
- Security systems
- Network and Wireless Access Points (WAP)
- Controls systems
Verify installation of equipment per design for:
- Security systems
- Network and WAP infrastructure
- Building Management System (BMS) and Emergency Power Supply (EMPS) controls
Physical Inspection
- Confirm proper installation of devices and equipment.
- Ensure labeling is accurate and workmanship is clean and professional.
Commissioning (Cx) Support
- Coordinate and monitor commissioning efforts for security systems.
- Assign commissioning scripts to equipment within Cx Alloy.
- Witness commissioning activities and document results in Cx Alloy.
- Track and follow up on punch list items to ensure resolution and path to completion.

Benefits Offered:
  • Medical insurance
  • Dental Insurance
  • Vision Insurance
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid National Holidays
  • Reimbursement for professional licenses and certifications


Submission Requirements:
At a minimum, the candidate's professional resume must include the following:
- List of all Educational Achievements
- List of all Professional Licenses or Certificates
- List of Awards Received
- Detailed Employment History with each company:
o Name of the firm or agency
o Start Date and End Date (Month & Year)
o Positions Held

Salary Range

$100,000-$150,000 USD

Similar Jobs

More Jobs at KALCON

More Real Estate & Construction Jobs

Find similar Low Voltage QA/Security Cx Associate (Owner's Representative) - Data Center Construction jobs: