As a Data Center Project Engineer, you will be a part of a creative, diverse team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry examples of energy efficient, cost-effective designs. You will work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
As our Data Center Project Engineer, you will support the teams that build some of the most interesting electrical and mechanical systems in the world. You will be on the construction site, daily interacting with the construction managers and stakeholders and be directly responsible for supporting the fast, high-quality delivery of our data center construction.
The Data Center Project Engineer will be part of the onsite Construction Management team and will own the communication coordination with our vendors, information workflow, and coordination of document management including requests for information (RFI), change orders, report, and schedule updates.
This position requires that the candidate selected be a US citizen.
Key job responsibilities
The Data Center Project Engineer will be responsible for:
- Establishing communication and coordination across a data center region's general contractors, stakeholders, and internal teams. Example includes sending out region wide changes to construction trailer setup, site access procedures, or location to access documents.
- Maintain a tracking system for design changes, RFI's (requests for information), and change orders and dashboard and track this information for regional leadership review. Include tracking status of priority and due dates.
- Requesting and reviewing MOPs (Method of Procedure) for proper detail, necessity, and risk.
- On-boarding new vendors for badging and orientation.
- Updating project management software with milestone dates, correspondence, and documents.
- Monitor delivery of owner furnished material to site.
- Compiling and storing construction data from vendors.
- Managing checklist including various checklists including substantial completion checks, safety, and quality.
BASIC QUALIFICATIONS
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field
- AND 2+ years of relevant experience, OR 7+ years of relevant experience in lieu of degree
- 4+ years of relevant experience constructing and managing complex MEP systems, including large-scale power distribution/generation gear and cooling systems in mission-critical environments
- 4+ years of relevant experience managing general contractors and vendors, including RFP processes, bidding, change orders, quality control, and RFI/submittal tracking in construction project execution
PREFERRED QUALIFICATIONS
- Strong understanding of data center system-level architecture, including electrical (e.g., switch gear, UPS, transformers) and mechanical (cooling systems) engineering principles
- Experience in designing and managing construction of complex data centers, critical infrastructure, or large-scale MEP plants
- Proficiency in reading and interpreting construction specifications and drawings for all disciplines, and ability to create and maintain project documentation
- Knowledge of relevant building codes and regulations (e.g., Life Safety, BOCA, NFPA, NEC, OSHA) and certifications such as Professional Engineer (PE), LEED, or Certified Construction Manager (CCM)
- Demonstrated ability to value engineer, finding innovative solutions to reduce costs and duration without compromising quality and reliability
The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.
USA, VA, Culpeper - 96,000.00 - 166,300.00 USD annually