Superintendent- HVAC (Onsite-Abernathy Texas/Data Center Construction)

Kelso Industries

• $80K — $95K *
Real Estate & Construction
5 - 7 years of experience
Job Overview by Ladders

Qualifications

  • Proven experience as a construction superintendent or similar role.
  • Strong knowledge of safety, quality, and health guidelines for job sites.
  • In-depth understanding of construction operations and processes.
  • Proficient in MS Office and MS Project for scheduling and reporting.
  • Excellent organizational and time-management skills.
  • Effective communication and leadership abilities.
  • Must have OSHA 30 certification.

Responsibilities

  • Lead and manage onsite construction teams effectively.
  • Coordinate day-to-day project operations oversight.
  • Ensure adherence to high quality standards and safety protocols.
  • Collaborate with project managers to develop and maintain schedules.
  • Conduct training and jobsite introductions for new hires and manage team reviews.
  • Manage project logistics and deliveries, ensuring material availability.
  • Utilize technology for efficient project tracking and reporting.

Benefits

  • Join a collaborative and safety-focused team.
  • Opportunity to lead medium to complex construction projects.
  • Experience diverse project environments with varying challenges.
  • Professional development opportunities in leadership and project management.
Full Job Description
Are you a hard-working construction leader who wants to join a winning team? Do you have an extreme commitment to safety and passion for quality work? If this sounds like you, then you should mull over a career with Mullins Mechanical. We are looking for an experienced Superintendent to join our team. As a Superintendent, you will play a key role in the success of Mullins Mechanical by ensuring successful completion of construction projects. The work location for this position will be based on assignment to a project location. Responsibilities • Lead and manage the onsite construction as a unified and collaborative team • Coordinate & oversee the day-to-day operations of assigned projects • Manage all field responsibilities on medium to complex projects and/or manage several smaller project teams simultaneously • Collaborate with the PM to create and maintain the project schedule • Lead new hire jobsite introductions and training, and assign jobs • Conduct direct report employee reviews annually or more often if needed • Collaborate with the estimating team to plan and provide technical guidance during the bidding of projects upon request • Ensure Mullins' high quality control standards are met and submit a detailed Non-Conformance Report on the day the quality deficiency is found • Assist PM in purchasing take-offs and project consumables • With prior permission of the PM and/or APM, purchase project consumables • Review preliminary project documents • Attend the hand-off meeting to discuss project scope, schedule, subcontractors, materials, and project start. • Review contract documents: plans, specifications, contract, and any other pertinent project information • Ensure Mullins' safety policies and procedures are enforced and maintained on a daily basis. This includes: • Enforcing site specific safety plan • Conducting weekly safety toolbox talks and submitting sign-in sheets • Ensure Mullins Safety Analyses (MSAs) are completed and reviewed as needed • Submitting detailed Incident Reporting Forms on the day the incident occurred • Prepare a two-week look ahead schedule with the PM • Ensure proper notification and documentation is made regarding delays • Communicate impact of delays to PM and appropriate parties • Notify PM, Subcontractors and Owner of opportunities to accelerate schedule, and obtain approval to proceed • Manage project deliveries and logistics • Coordinate with the Owner/General Contractor and/or other subcontractors to ensure adequate laydown and staging areas for materials and prefabrication at the jobsite. • Submit material requisitions two weeks in advance • Maintain adequate material on jobsite • Oversee material management plan • Identify all tool and equipment needs for the project • Maintain tools and equipment provided by Mullins to their jobsite, both owned and rented • Collaborate with the PM to call off rental equipment • Confirm the proper installation of all equipment on project • Use current technology (mobile apps, email, etc.) to track and distribute information on construction projects • Update, review and/or submit the following reports/logs in a timely manner: • Daily Field Logs • If applicable, Daily T&M Sheet • Tool Maintenance Log • Time Sheets w/Per Diem, Ride Time, and Vacation needs included • Receiving and Manifest Reports • Employee Reprimand, Termination, Time Off/Vacation Forms • Daily Pipe and Structural Weld Reports • Vehicle Inspection Report • Welding Machine Report • Hydro and Pneumatic Test Reports • As-Built Drawings • Assist the PM in creating the following: • Job Cost Updates • Monthly Billing • Organize and lead weekly project meetings with Mullins' Foremen and subcontractors • Track progress of Foremen and subcontractors to hold them accountable for their production and performance. • Attend the close-out meeting to document lessons learned • Ensure jobsite remains clean and orderly Qualifications • Previous experience and proven track record as a construction superintendent for a trade Mullins self-performs, or in a similar role • Knowledge of safety, quality, and health guidelines for construction job sites • In-depth understanding of construction operations and processes • Proficiency in MS Office and MS Project • Organizational and time-management skills • Ability to communicate professionally • Ability to lead and inspire • OSHA 30 certification

More Jobs at Kelso Industries

More Real Estate & Construction Jobs

Find similar Superintendent- HVAC (Onsite-Abernathy Texas/Data Center Construction) jobs: