7

Construction Scheduler Jobs Near Pensacola, FL

Project Engineer (Land Development)
$80K - $100K

Responsibilities include: conduct preliminary/due diligence evaluations, prepare various reports, produce design and construction drawings, prepare technical specifications, and prepare permit submitt...

Posted 4d ago

  •   5 - 7 years exp.  •  Technical Services

Senior Water Resources Engineer
$
SNC-LavalinPensacola, FL 32501 and 1 other location

Performs project design, sketching design concepts to be developed by junior engineers, CAD designers or technicians; plans and reviews the production of engineering drawings and specifications...

Posted 2w ago

  •   5 - 7 years exp.  •  Technical Services

Project Engineer (Land Development)
$80K - $100K

Responsibilities include: conduct preliminary/due diligence evaluations, prepare various reports, produce design and construction drawings, prepare technical specifications, and prepare permit submitt...

Posted 2w ago

  •   5 - 7 years exp.  •  Technical Services

CEI Senior Project Engineer
$80K - $100K

Perform independent complex inspections of roadways and structure construction processes and materials to assure compliance with the construction contract...

Posted 7w ago

  •   5 - 7 years exp.  •  Real Estate & Construction

Integration Engineer
$100K - $150K
Change HealthcarePensacola, FL 32501 and 1 other location

Participate in the full software development life cycle from requirements analysis through test, release and maintenance. Interface with Quality Assurance to ensure accurate delivery of project requi...

Posted 3d ago

  •   5 - 7 years exp.  •  Healthcare

ReStore Director

Establish and maintain relationships with potential and existing donors, including contractors, suppliers, individuals, businesses, community and church groups to increase quality and quantity of merc...

Posted 5w ago

  •   Education, Government & Non-Profit

Software Engineer-.Net/C#

Interface with Quality Assurance to ensure accurate delivery of project requirements and compliance with standards, code quality and accepted conventions...

Posted 6w ago

  •   5 - 7 years exp.  •  Healthcare