Steve P Rados, Inc

Steve P Rados

Steve P Rados

Jun 22, 1:24 PM

Offloading 108"" steel pipe for LADWP LA Reservoir UV Disinfection Plant construction project in Sylmar

May 26, 5:58 PM

Removing AC at @Elysianreservoir prior to paving and installation of floating cover

May 9, 4:12 PM

Torquing large diameter flange bolts on west header elbow in manifold room on Long Beach Main Pumping Plant Facility Upgrade project

Dec 29, 4:26 PM

Crane pick of 32LF 32,000 lbs 60"" welded steel pipe. Being installed in 53'' pit to be vertically welded to already installed elbow. Large diameter waterline being constructed for #LADWP