Moventas

Moventas

Moventas is a Finnish company manufacturing mechanical power transmission equipment and providing after sales service for the renewable energy industry. Moventas is part of the Santasalo Moventas Group, owned by the global industrial engineering firm Clyde Blowers, based in East Kilbride, Scotland. Wikipedia

Moventas

Moventas is a Finnish company manufacturing mechanical power transmission equipment and providing after sales service for the renewable energy industry. Moventas is part of the Santasalo Moventas Group, owned by the global industrial engineering firm Clyde Blowers, based in East Kilbride, Scotland. Wikipedia

  • Jan 11 at 10:54 AM
    Yet another Exceed wind turbine gearbox packed and ready to find a new home soon! Over 1 GW of Exceeds have already been delivered to three customers in five continents. More about Exceed here: http://www.moventas.com/products/exceed/
  • Nov 9 at 9:25 AM
    Heres the first prototype of 4MW+ Exceed gearbox, going to a leading wind turbine manufacturer for testing! The main key performance indicators for comparing the turbine generations include levelized cost of energy (LCOE) and annual energy production (AEP). This new, bigger Exceed gearbox, pictured in front of the existing 3MW+ one, continues the success of the 3MW+ class and takes it to the next level by helping the turbine to achieve higher AEP GWh/year thus lowering the LCOE.
  • Oct 26 at 9:16 AM
    Vi r p mssa igen! #Vind2016 2627 October in Sweden. Welcome to our booth 34! http://www.vindkraftsbranschen.se/vind2016/
  • Sep 30 at 7:24 AM
    Final day of WindEnergy Hamburg begins, still time to meet us at Hall 5B Stand 423!

Jan 11, 10:54 AM

Yet another Exceed wind turbine gearbox packed and ready to find a new home soon! Over 1 GW of Exceeds have already been delivered to three customers in five continents. More about Exceed here: http://www.moventas.com/products/exceed/

Nov 9, 9:25 AM

Heres the first prototype of 4MW+ Exceed gearbox, going to a leading wind turbine manufacturer for testing! The main key performance indicators for comparing the turbine generations include levelized cost of energy (LCOE) and annual energy production (AEP). This new, bigger Exceed gearbox, pictured in front of the existing 3MW+ one, continues the success of the 3MW+ class and takes it to the next level by helping the turbine to achieve higher AEP GWh/year thus lowering the LCOE.

Oct 26, 9:16 AM

Vi r p mssa igen! #Vind2016 2627 October in Sweden. Welcome to our booth 34! http://www.vindkraftsbranschen.se/vind2016/

Sep 30, 7:24 AM

Final day of WindEnergy Hamburg begins, still time to meet us at Hall 5B Stand 423!