Modular Space

Modular Space

Founded:
1986

Modular Space

Founded:
1986

Aug 18, 11:24 AM

Unified Fire Services Area (UFSA) needed a new fire house for three full-time employees in Eagle Mountain, Utah. The building had to fit in a 24 x 60 area and it had to be ready in just 120 days. UFSA quickly realized modular construction was the best choice to complete the job on time. ModSpace went to work on designing and building two 12 x 60 modular units that incorporated all of UFSAs requirements; three bedrooms, two restrooms, a kitchen, a lounge and a space for a washer and dryer. They were delivered, installed and the building was ready for occupancy in less than 120 days.

Jul 26, 2:50 PM

Pope John XXIII Middle School of Sussex County, New Jersey was facing several challenges, including fluctuating enrollment, three separate locations and rising maintenance costs. They needed a new central facility quickly, and within their tight budget. ModSpace delivered this 22,000-square-foot school in 96 days and within their budget.

Jul 19, 0:53 PM

A home builders association in Central Ohio will be using HQ ground-level offices for their annual show again this year. The HQ ticket booths are another great example of the ease and versatility of HQ.

Jul 13, 11:30 AM

One of 8 modular buildings is being craned into place at the future site of the Wissahickon Valley Boys and Girls Clubs of America. The new facility will help nearly 100 at-risk children in the Ambler, PA area when it opens in September. @bgca_clubs

9 jobs at Modular Space

Jobs in